December 13, 2011
Open to the Stars
Your Stone Bank blogger clambered up the scaffolding and onto the roof today with general contractor Fred Kainz to get a progress report on the removal of roof beams on the back of the Stone Bank.
Great view AND a positive progress report. That’s worth a climb to the roof.
By 4 p.m. today, Fred had liberated all but two of the beams.

A pile of roof beams covered the floor of the Stone Bank's back room on Tuesday.
At right is the temporary wall that will close the rest of the building this winter.
At top, the stubs of the roof beams remain embedded in the north wall.
The building's back was is at left,
and the Stone Bank blogger is standing on the top of the scaffold -- gulp.
Fred noted that some of the beams were sagging from the weight of many layers of asphalt roofing. But this wipes the slate clean — really clean.
With the beams removed, our stone mason will be able to continue dismantling the stone facade on the back 20 feet of the building. We’ll keep you posted on the progress.
Leave a Reply