December 13, 2014
Stone Quote No. 11
We are feeling kind of philosophical as the end of the year draws near. We are proud of our progress on restoring the bank and eager for what comes next.
Yes. We are looking ahead with optimism to the next step in our project. In 2015, we WILL raise the back of the building and put the roof on. PERIOD. We are ready to go. Our greatest concern is hiring the help to do the heavy lifting.
Because of the oil boom in North Dakota, it has been excessively difficult to find the skilled labor (plumber, electrician and contractor) that we need to get this done. With oil prices down, the prediction is that oil exploration will slow. That could be good new for us — because some of the building trades guys might have time to work with us.
We also need to match a $20,000 grant from the Historical Society of North Dakota. That will go a long way to enclosing the building in 2015. (We actually hope to get the floor joists in place this winter — as soon as the plumber finishes his work in our brand new basement.)
As you make your charitable gifts at the end of 2014, please make a gift to the Stone Bank restoration. We are a 501(c)(3) nonprofit, so your gift is tax deductible. Your gift will move the Stone Bank closer to its new life as a working building on Bottineau’s Main Street! We are on the right road!
Learn more about the project, the bank’s history, make a contribution or dedicate a stone on our website.
As always, thanks for reading the Stone Bank blog!
Leave a Reply