July 11, 2015
Mud, stone and progress
OK. Sure. It looks like a muddy hole in the ground.
But we look in that hole and see PROGRESS!
Why? Because, dear friends, that black round object in the photo below is a sewage lift pump that has been installed in the Stone Bank’s new basement.
We had to wait through the winter and a very chilly spring to have the pump installed. It has seals that can’t be exposed to extreme cold. And then, we had to wait our turn for a very busy plumber.
But finally. The lift pump is in and we are moving forward.
Here’s what you’re seeing in the photo above: At rear is the original foundation of the Stone Bank building from 1900. The section of the building that we dismantled was sitting on shallow footings — and from the opening at left, there was only a crawl space under the back of the building. At right, you can see the new foundation wall that extends 20 feet from the back of the building. Deep footings and a proper basement are ready to support the building again. With the plumbing roughed in, the work is progressing on finishing the basement floor in poured concrete.
We must complete this part of the project by the end of July to collect a grant from the Historical Society of North Dakota. We need your help to make this happen.
This is the time to make a donation. Every penny donated will go toward rebuilding the back of this wonderful, historic building on Bottineau’s Main Street.
Make a contribution today. We really need everyone’s support to move this from mud to marvelous!
Send a check to: Touchstones, Inc., P.O. Box 272, Bottineau, ND 58318.
Find our PayPal and Razoo online giving accounts on the side panel of the blog!
Thanks to all of our longtime supporters. If you have been waiting to give. NOW is really a good time.
Leave a Reply