There you go! We have a fresh concrete floor in the Stone Bank’s basement.
This is the room where there were two heating fuel tanks for the building’s old boiler and the floor was dirty, crumbling concrete.
Much better.
In the lower right of the photo above, the black circular object is the top of our recently installed sewage lift pump. PROGRESS x 2.
Here is the in-floor heating in the part of the building that we took down and are putting back together. A concrete floor will be poured over the heat elements. In-floor heat! Pretty cool update for an old building in a cold climate.
Now, the back 20-feet of the building has nice deep footings to support the weight of a stone-clad structure. When our nonprofit purchased the Stone Bank in 2011, the back section of the building had only a crawl space — and the back wall of the building was sinking, because it was resting on footings that were much too shallow.
When complete, the back of the Stone Bank will look much the same as it did when we started the project, but it will have a much sturdier foundation, a handicap entrance and two handicap-accessible restrooms.
That’s the way you take a building from 1900 into 2015 — and beyond.
Do you want to be part of the Stone Bank project? We always welcome volunteers, but right now, we really need donations to keep the ball — or stone — rolling on enclosing the back of the building.
Your donations will help us match a generous $20,000 grant from the Historical Society of ND. We also accept online gifts with PayPal and Razoo. The links are in the sidebar.
As always, thanks for reading the Stone Bank blog. Please, share this post with your friends and family!
Leave a Reply